Back |
---|
LINE BORING ON SITELine boring in the field of RH170 bucket at Kideco mine site, Batukajang, Kaltim This was site works for Thiess undertaken in May 2002. |
||
![]() |
||
![]() |
![]() |
Back |
---|
LINE BORING ON SITELine boring in the field of RH170 bucket at Kideco mine site, Batukajang, Kaltim This was site works for Thiess undertaken in May 2002. |
||
![]() |
||
![]() |
![]() |